Redrow Homes (penymynydd)

Added: Monday 16th June 2014

This contract was a larger scale site carried out for Sutcliffe Play ltd and Redrow Homes. We have extended this case study over two pages as the site was so big please check the next case study to see more pictures of the contract.

Install the following playground equipment.

1 x Kaiser sand play unit

1 x oyster dish

1 x kaiser play unit 

1 x set of flat swings

1 x trampoline

1 x kaiser springy

1 x spinning dish 

1 x basket swing

1 x kaiser rope bridge unit

1 x kaiser adventure trail

1 x kaiser  gazebo bridge

3 x litter bins

3 x benches

Supply and lay 475 sqm of grassmats

create sand pit with play spec sand and log edgings

 

Landscape works

Shaping soil mounds approx 1400 sqm

Import approx 80 tonnes of top soil

Spread and rotovate top soil in preparation for turfing

supply and lay 1400 sqm of turf 

supply and install 20 no purbeck stone boulders

 

 

 

 

 

 

 

Images of this Project

Redrow Homes (penymynydd) continued Holland Moor Primary School (Skelmersdale)