Excavate the area and lay pcc edging kerbs.

Instal log round tanalized edgings  for space net 

Lay Geo-textile membrane

Import and lay mot type 1 stone

Lay play bark inside of space net area

Lay rubber wet pour safety surfacing to conform with safety regulations.

Lay Tarmac paths to individual pieces of play equipment

Install play spec bow top fencing with two self closing gates

 

Installation of the following play equipment

1x Junior multi-unit with climb wall.

1x Toddler unit.

1x Junior swing.

1x Toddler swing.

1x Space net.

1x Spinner bowl 

2x Benches 

2x Thermoplastic playground graphics to tarmac paths.

Contract completion time was 4 weeks